Our London Road development is now in the final stages, with all major installations and finishes nearly complete. Here’s a look at the latest progress on-site.
Final Decorating & Furnishings
Bedrooms Decorated: All rooms are fully decorated, with wallpapers and feature panelling set to be completed next week.
Corridors: Painted but awaiting a final coat to keep them fresh after any final touches.
Wardrobes Installed: All wardrobes are in place, with doors fitted and furniture beginning to arrive.
Bathrooms Complete: Fully fitted with basins, showers, and toilets, ready for residents.
Kitchen & Living Spaces
Main Kitchen Complete: Worktops are fitted, cupboards are installed, and all finishing touches are done.
Appliances Arriving: Scheduled for next Monday, with plumbing connections set to follow.
Heat Pumps Connected: These are now plumbed in and will be commissioned on Thursday.
Exterior & Energy Efficiency
Backyard Finished: Decorative stone laid, creating a clean and tidy outdoor space.
Stack Pipes & Heat Pumps Installed: Energy-efficient systems are ready to go.
Solar Panels (PV Panels): Fully wired and ready to provide sustainable energy to the building.
What’s Next?
Wallpaper and feature panelling will be completed in bedrooms.
Corridor walls will get their final coat of paint.
Kitchen appliances will be fitted, completing the main living space.
Heat pumps will be commissioned, making the building fully operational.
We are now approaching the final reveal of our London Road co-living space—a premium, energy-efficient property designed for modern shared living. Stay tuned for the final unveiling!

DISCLAIMER
Aura Property Ventures Ltd works with High Net Worth or Sophisticated Investors only. Any information provided here is not for public promotion and is not to be regarded as an FCA-approved regulated investment.
Please read our terms and conditions relating to the use of this site for further information.